Your takeoff is built from the model, not highlighters on a plan. Here's what it covers, with the numbers from our example house.

In your framing takeoff

  • A cut list: studs, plates, headers, joists, rafters and trusses
  • Lumber by size and stock length, with waste
  • Trusses by span and pitch
  • Wall sheathing, hardware and nails
  • Crew-hours and days
  • A 3D stick model with every piece in it, floor by floor
  • A supplier order sheet to save as a PDF and email to your supplier. See a sample
A farmhouse framed in 3D: studs, plates and roof trusses
A second exampleThe farmhouse: 1,505 sticks of lumber and 34 trusses.
How it works

From plan set to framing takeoff.

  1. 01

    Upload

    Send your plan set as one PDF. No site visit needed to bid.

  2. 02

    Read

    We read the structural sheets: walls, floors and roof framing.

  3. 03

    3D model

    We frame the house piece by piece.

  4. 04

    Bid

    The cut list and lumber order go into your takeoff.

  5. 05

    Your 10-minute check

    You spend about 10 minutes checking it against your plans. Then it's ready to send.

Price

What a framing takeoff costs.

For owner-builders and framers, at today's prices from our price list. You see what your plan set costs before you pay.

Framers · one trade

A cut list, not a guess.

Upload the plans and get every piece counted. Check the takeoff and bid the job.

Priced per plan set3D model included
  • Every stud, plate and header
  • Lumber by stock length, waste in
  • Crew-days to plan the job
How it adds up
Framing takeoff + stick modelat upload
3D model of the houseBuilt from your plans, with every trade you orderIncluded
Pages over the page limitOnce per order, for each page past the limita little a page
Upload your plans

Every bid is an estimate from your plans. Plans don't show field changes: walls moved on site, extra blocking, or framing an engineer or inspector asks for. Anything built differently from the drawings won't be in the bid. We recommend a site visit to confirm measurements and conditions before you sign a contract or order materials.

Page count is the number of sheets in the PDF you upload. A trade marked "price coming soon" can be ordered once its price is set.

Questions

Framing questions.

How do you do a framing takeoff from plans?

We read the structural sheets for stud size and spacing, plate heights, the floor system and the roof framing. Then we frame the house in 3D, piece by piece, and the cut list comes off that model.

What's on the cut list?

Every stud, plate, header, joist, rafter and truss, as lumber by size and stock length, plus sheathing, hardware and nails. Our example house needs 1,807 sticks, 93 trusses and 41 jack rafters.

Are interior walls included?

The model frames the outside walls, floors and roof. Interior walls are estimated from the floor area and added to the lumber: 440 feet on our example house.

Do you add waste?

Yes. The lumber is ordered in stock lengths, with the cutting drop and 5% waste on top.

Trusses or rafters?

Whatever your plans call for. Our example house is trussed, with 41 jack rafters where no truss reaches.

What about a garage on a slab?

A concrete slab gets no floor framing. Our example house's garage is a 1,134 sf slab, so the takeoff frames the walls that stand on it, with treated bottom plates and anchor bolts, and leaves the slab to the concrete contractor.

Is this an exact price?

No. It's an estimate built from your plans. Plans don't show field changes: walls moved on site, extra blocking, or framing an engineer or inspector asks for. Anything built differently from the drawings won't be in the bid. We recommend a site visit to confirm measurements and conditions before you sign a contract or order materials.

Why "10 Minute Bids"?

We read your plans, build the house in 3D and measure each trade off the model. You spend about 10 minutes checking it against your plans, and it's ready to send. That's the 10 minutes in our name. Building the model is our part, and it takes longer, depending on the plan set.