10 Minute Bids
What you get

Every device, circuit and foot of wire.

The takeoff is built from the model, device by device. Here's what it covers, with the numbers from our example house.

In your electrical bid

  • Every device placed: outlets, switches, lights, fans and appliances
  • Circuits by type: lighting, general, small appliance, dedicated
  • Cable by gauge, routed along the walls
  • Service size from an NEC 220 load calculation
  • Smoke and CO alarms, room by room
  • Code gaps, like outlet spacing, flagged for you
  • Rough-in and trim hours
  • A supplier order sheet to save as a PDF and email to your supplier. See a sample
The modern example house, see-through, with its wiring and devices
A second exampleThe modern house: 205 devices on 35 circuits and 6,201 ft of cable.
How it works

From plan set to electrical bid.

  1. 01

    Upload

    Send your plan set as one PDF. No site visit needed to bid.

  2. 02

    Read

    We read the electrical sheets, floor plans and notes.

  3. 03

    3D model

    We place every device and route every circuit.

  4. 04

    Bid

    Devices, wire and hours go into the bid.

  5. 05

    Your 10-minute check

    You spend about 10 minutes checking it against your plans. Then it's ready to send.

Price

What an electrical bid costs.

For homeowners and electricians, at today's prices from our price list. You see what your plan set costs before you pay.

Electricians · one trade

Devices, circuits and wire, counted.

Upload the plans and get the layout counted and the cable routed. Check it and bid the job.

Priced per plan set3D model included
  • Devices and circuits by type
  • Cable by gauge, routed on the walls
  • Code gaps flagged before you bid
How it adds up
Electrical bidat upload
3D model of the houseBuilt from your plans, with every trade you orderIncluded
Pages over the page limitOnce per order, for each page past the limita little a page
Upload your plans

Every bid is an estimate from your plans. Plans don't show code or inspector changes, the existing service, or devices added during construction. Anything built differently from the drawings won't be in the bid. We recommend a site visit to confirm measurements and conditions before you sign a contract or order materials.

Page count is the number of sheets in the PDF you upload. A trade marked "price coming soon" can be ordered once its price is set.

Questions

Electrical questions.

Can you do an electrical takeoff from blueprints?

Yes. We read the electrical sheets and floor plans, place every device on a 3D model of the house, and group them into circuits. Our example house has 207 devices on 39 circuits.

How is the wire measured?

Cable is routed along the walls on the model, not drawn in straight lines, then totaled by gauge. Our example house needs 6,001 feet of NM cable with 8% waste.

What if the plans leave something out?

The takeoff checks the layout against the electrical code and flags gaps. On our example house it found three wall stretches too far from an outlet, and a kitchen island with no outlet planned. Anything the plans don't say, like the panel size, is listed for you to confirm.

How do you size the service?

With an NEC 220 load calculation on the living area. Our example house has 3,284 sf of living area, and the optional method (NEC 220.82) fits a 200-amp service.

Is the 3D model extra?

No. Your electrical bid includes the 3D model of the house, and so does every other trade on the same order. You see the total before you pay.

Is this an exact price?

No. It's an estimate built from your plans. Plans don't show code or inspector changes, the existing service, or devices added during construction. Anything built differently from the drawings won't be in the bid. We recommend a site visit to confirm measurements and conditions before you sign a contract or order materials.

Why "10 Minute Bids"?

We read your plans, build the house in 3D and measure each trade off the model. You spend about 10 minutes checking it against your plans, and it's ready to send. That's the 10 minutes in our name. Building the model is our part, and it takes longer, depending on the plan set.