10 Minute Bids
What you get

Doors, trim and cabinets, counted.

Your takeoff is built from the model, room by room. Here's what it covers, with the numbers from our example house.

In your finish carpentry bid

  • A door schedule with jambs and hardware
  • Base, casing and crown by the foot, with the corners
  • Trim for every window
  • Closet shelves and rods
  • Stair parts: treads and balusters
  • Cabinet runs by type; countertops as an allowance
  • A 3D model with every piece in place
  • A supplier order sheet to save as a PDF and email to your supplier. See a sample
The modern example house, see-through, with its doors, trim, cabinets and stairs
A second exampleThe modern house: 20 door units, 654 ft of base and 910 ft of casing.
How it works

From plan set to finish carpentry bid.

  1. 01

    Upload

    Send your plan set as one PDF. No site visit needed to bid.

  2. 02

    Read

    We read the door schedule, floor plans and details.

  3. 03

    3D model

    We place the doors, trim, closets, stairs and cabinets.

  4. 04

    Bid

    Every piece goes into your bid, by the unit or the foot.

  5. 05

    Your 10-minute check

    You spend about 10 minutes checking it against your plans. Then it's ready to send.

Price

What a finish carpentry bid costs.

For homeowners and finish carpenters, at today's prices from our price list. You see what your plan set costs before you pay.

Finish carpenters · one trade

Doors, trim and cabinets, counted.

Upload the plans and get the door schedule and every trim run measured. Check the bid and send it.

Priced per plan set3D model included
  • Trim by the foot, corners counted
  • Doors with jambs and hardware
  • Carpenter hours to plan the job
How it adds up
Finish carpentry + cabinetsat upload
3D model of the houseBuilt from your plans, with every trade you orderIncluded
Pages over the page limitOnce per order, for each page past the limita little a page
Upload your plans

Every bid is an estimate from your plans. Plans don't show trim as built: most trim is measured on site, and walls and openings shift during construction. Anything built differently from the drawings won't be in the bid. We recommend a site visit to confirm measurements and conditions before you sign a contract or order materials.

Page count is the number of sheets in the PDF you upload. A trade marked "price coming soon" can be ordered once its price is set.

Questions

Finish carpentry questions.

How do you do a trim takeoff from plans?

We read the door schedule and trace every room, then measure the base, casing and window trim on a 3D model of the house. Doors, closets, stairs and cabinets come off the same model.

Is trim counted by the piece or by the foot?

By the foot, with the corners counted: our example house has 737 feet of base with 122 inside and 19 outside corners. Doors are counted as units.

What if my plans don't show which way the doors swing?

The takeoff flags it. On our example house, 17 prehung doors had no swing on the plan, so the bid says to confirm them before ordering.

Are cabinets included?

Yes. Cabinet runs are measured in feet by type: base, upper, tall, island and vanity. Countertops go in as an allowance.

What trim sizes do you assume?

Most plan sets don't draw the trim, so the takeoff says what it assumed, like 3-1/4 inch base and 2-1/4 inch casing, for you to confirm.

Is this an exact price?

No. It's an estimate built from your plans. Plans don't show trim as built: most trim is measured on site, and walls and openings shift during construction. Anything built differently from the drawings won't be in the bid. We recommend a site visit to confirm measurements and conditions before you sign a contract or order materials.

Why "10 Minute Bids"?

We read your plans, build the house in 3D and measure each trade off the model. You spend about 10 minutes checking it against your plans, and it's ready to send. That's the 10 minutes in our name. Building the model is our part, and it takes longer, depending on the plan set.